Sign In | Join Free | My himfr.com
Home > Upward Continuous Casting Machine >

45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod

Wuxi Huadong Industrial Electrical Furnace Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod from wholesalers
     
    Buy cheap 45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod from wholesalers
    • Buy cheap 45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod from wholesalers

    45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod

    Ask Lasest Price
    Brand Name : Jingjie
    Model Number : GVT
    Price : negotiation
    Payment Terms : T/T or L/C
    Supply Ability : 10sets per month
    Delivery Time : 30 working days after received your payment
    • Product Details
    • Company Profile

    45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod


    45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod



    AN OXYGEN FREE COPPER ROD Φ8mm CONTINUOUS CASTING PRODUCTION LINE


    COMPOSITION OF EQUIPMENT
    Single furnace, continuous casting machine, guild wheel frame, wire frame, double bar coiling machine, water cooling system, temperature measurement system and control system.


    MAIN TECHNICAL PARAMETERS OF THE EQUIPMENT
    1, there is a core frequency induction furnace
    (1) production of T2 copper rod (raw material electrolytic copper, bright wire)
    (2) furnace body structure
    (3) electric furnace power 45KW
    (4) electric furnace voltage 380V
    (5) the frequency of electric furnace 50HZ
    (6) the melting rate of less than 150kg
    (7) electric furnace capacity 500kg
    2, continuous casting machine
    (1) the number of cast rod 2
    (2) cast rod diameter specification 8mm; head number 2
    (3) drive AC servo drive
    (4) servo motor power 1.3KW
    (5) the tracking accuracy of the liquid level is + 2mm
    3, double bar coiling machine
    (1) automatic take-up rod
    (2) to close the line into a circle around the weight of 300kg


    PRODUCT TECHNICAL STANDARDS
    1, density: 8.9kg/dm fand


    DELIVERY OF TECHNICAL DOCUMENTS AND DRAWINGS
    1.The Seller shall provide the following documents and drawings within 15 days after the contract is signed and effective.
    a. Equipment layout plan
    b. The basic condition of equipment and civil engineering
    c. Water and electricity layout
    d. The operation platform.
    2. The Seller shall provide the following documents and drawings when the equipment is delivered.
    a. Process document and operation specification of continuous casting machine
    b. The general equipment and consumables drawings.
    c. Detail table of equipment wearing parts
    d. The electrical principle diagram and system diagram.
    e. The installation of electrical cable material list.


    SELLER'S SCOPE OF RESPONSIBILITY

    1. The Seller shall be responsible for the installation and commissioning of the contract equipment and the delivery of the relevant provisions of the annex.
    2, according to the contract requirements to submit the relevant technical documents.
    3. Responsible for the installation, commissioning and training of contract equipment.
    4, equipped with special tools for the use of the installation.
    5, technical services: customer service guaranteed for one year, life-long maintenance (except coil, water jacket, melting ditch).
    6, follow-up technical support: equipment upgrades and assist to build the furnace, etc..
    7, service response time: the buyer informed within 48 hours.
    8, responsible for equipment acceptance and timely handling of the relevant transfer procedures.


    BUYER'S SCOPE OF RESPONSIBILITY
    1, production workshop: span, length, height of crane lifting equipment installation, all shall comply with the requirements.
    2, circulating cooling water.
    3, power supply.
    4, compressed air.
    5, test for production of raw materials and auxiliary (charcoal, graphite flake etc.)
    6, the seller is responsible for the provision of equipment in the installation process of staff and board.


    MAIN EQUIPMENT CONFIGURATION AND SUPPLY RANGE




    MAIN SUPPORTING DEVICE BRANDS AND MANUFACTURERS

    Device nameBrands and manufacturers
    1AC servo motorJapan Yaskawa
    2High precision reducerNAIF
    3Servo driverJapan Yaskawa
    4PLC controllerJapan Yaskawa
    5Man machine interfaceWEINVIEW
    6Electrical original deviceSchneider
    7Motor and speed reducer equipped with wire winding machineShanghai Saini transmission Co.
    8ThermocoupleShanghai Bao Lian
    9Oven building materialHenanGongyi
    10Graphite modelShandong Laixi De River

    DATE OF DELIVERY
    To be delivered within 75 days after the contract becomes effective.

    AFTER-SALES SERVICE
    1. The main body of the equipment will have one year of free warranty, and special components shall be discussed separately;
    2. During the trial-production period (within 3 months after equipment commissioning is finished), our company will dispatch a professional technician for follow-up service;
    Within the warranty period, if fault occurs due to quality problem, our company will dispatch personnel to the site to solve the problem within 72 hours after receiving the notice;
    After the warranty period of the equipment is expired, our company will offer effective solutions within 24 hours after receiving the notice, and will dispatch personnel for maintenance work if the user fails to solve the problem, only charging the cost expenses.
    For annual overhaul of equipment, our company will dispatch professional technician to join the users in formulating the turnaround plan, free of charge;
    Within the warranty period, our company can dispatch professional technician to the site to check the operation condition of equipment and provide field service.
    After the warranty period of equipment expires, one return visit can be made on invitation once per half a year.
    3. If our company has innovation and improvement points or constructive suggestions for similar equipments, we will inform the user in time.

    Wuxi East China Furnace Co.,Ltd

    No.3 Bashi Furong Industrial Park,Xishan District,Wuxi City,Jiangsu Province,China
    Contact person: Joey.Wong
    Tel: +86 510 83788308
    Fax: +86 510 83786308
    Mob: +86 139 2112 5611
    Wechat: 86 139 2112 5611

    Whatsapp: 86 139 2112 5611

    joey@wxhddl.cn

    Quality 45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Wuxi Huadong Industrial Electrical Furnace Co.,Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)